Battery Pack Assembly Steps: From Cell to Shipping

CBI
Tim Cimahi Battery Industry
•
20 November 2026
•
8 min read
“Assembling a battery pack takes nine steps, from inspecting and grading incoming cells to fitting the BMS, balancing, closing the casing and final testing.”

Assembling a battery pack takes nine steps, from inspecting and grading incoming cells to fitting the BMS, balancing, closing the casing and final testing. This article explains each step and the reason behind it.

Assembling a battery pack is more than connecting cells one by one. Small differences between cells, a connection that is not tight enough, or a skipped step can make a pack lose capacity quickly, or create risks in long-term use.

This is the second article in our series on battery assembly. The first article covers the basics of cells, modules and packs.

1. Inspecting newly arrived cells

Before any work starts, every cell is inspected one by one. The following are recorded:

  • Physical condition: dents, deep scratches, leakage or bent terminals.
  • Initial resting voltage, usually called OCV (open circuit voltage).
  • Internal resistance (IR), measured with a dedicated instrument. This value shows how "freely" the cell conducts current.

Cells that deviate far from their group are set aside, not forced into a pack.

2. Grading: grouping matched cells

This is the step most often underestimated, yet it has the largest effect.

Grading means grouping cells whose capacity, voltage and internal resistance are close, then using only cells from the same group in one pack.

The reason was given in the first article: a pack is only as strong as its weakest cell. In a series connection, the same current flows through every cell. If one cell has a smaller capacity, it reaches the full limit first during charging, and the empty limit first during use. As a result, the BMS cuts off earlier, and the usable capacity of the pack is smaller than it should be.

Cells with different internal resistance also cause uneven heating, because a cell with higher resistance runs warmer at the same current.

3. Arranging to the configuration

Once the cells are collected in one group, they are arranged to the requested configuration, for example 16S1P. Points to watch at this step:

  • Terminal orientation, so the busbar paths are short and do not cross.
  • Holders or spacers between cells, so each cell is locked in place and does not shift.
  • Spacing between cells, so heat has a way out and prismatic cells have room to expand.
  • Banding or compression of prismatic cell stacks, so the pressure is uniform.

4. Connecting the cells

The connection method depends on the cell format.

On prismatic cells, the terminals are bolt-type, so the cells are connected with metal busbars fastened with bolts. What matters here is the tightening torque. If it is too loose, the joint has high resistance and becomes a hot spot. If it is too tight, the thread or terminal can be damaged. That is why tightening is done with a torque wrench, not by hand feel.

On cylindrical cells, connections usually use nickel strip that is spot-welded or laser-welded.

One rule must be kept throughout this step: never let a metal tool bridge two terminals of opposite polarity. An open pack has no protection, and a short circuit across cells at high voltage releases a large amount of energy in a short time. For this reason, wrenches are wrapped in insulation, and metal rings or watches are removed before work.

5. Fitting the BMS and sense wires

The BMS is installed with two groups of wiring:

  • Sense (balancing) wires, one wire for each cell connection point, so the BMS can read the voltage of each cell.
  • Temperature sensors, usually NTC, attached in contact with the cell body, not hanging in the air.

The order of the sense wires must not be mixed up. The BMS reads voltages in sequence, so a swapped wire gives wrong readings and the protection does not work as intended. After installation, the reading for each cell on the BMS is compared with a manual measurement.

6. Initial balancing

Before the pack is closed, the voltages of all cells are equalized. This step is done while the cells are still easy to reach.

If the pack is closed while the voltage difference between cells is still wide, the BMS has to work for a long time to equalize it. On some BMS units the balancing capability is small, so a wide difference can persist for a long time and keep the usable capacity below its maximum.

7. Casing, insulation and protection

Once the electrical circuit is complete, the pack is fitted with:

  • Insulation sheets between the busbars and the casing walls.
  • A fuse or breaker on the output line, as a second protection outside the BMS.
  • Output terminals and, if needed, a data communication socket.
  • The casing, which is closed, fastened and labeled.

The label should state the nominal voltage, capacity, configuration and pack serial number.

8. Final testing

A pack is not declared finished until it has been tested. Common tests:

  • Insulation test: No current leakage between live parts and the casing.
  • Capacity test: The pack is fully charged, then discharged under measurement, to confirm the actual capacity matches what was promised.
  • BMS protection test: Cut-off on overcharge, over-discharge and overcurrent actually works.
  • Communication test: Pack data is read correctly by the inverter or controller, if a data link is used.
  • Temperature check: No spot runs much hotter than the rest, which usually indicates a loose connection.

The capacity test is the only way to confirm the figure on the label is correct. Without it, the pack capacity is only an estimate based on the cell specifications.

9. Records and serial numbers

The last step is record-keeping. For each pack, the serial number, the cells used, the grading results and the final test results are recorded.

The value of these records shows later. If a pack ever has a problem, the records show which group its cells came from, so the investigation can be targeted instead of guessed.

Summary

1. Inspect incoming cells: physical condition, voltage and internal resistance.

2. Group matched cells (grading).

3. Arrange to the configuration, with holders and spacing.

4. Connect with busbars at the correct torque.

5. Fit the BMS, sense wires and temperature sensors.

6. Equalize cell voltages before closing the pack.

7. Fit insulation, protection, terminals and casing.

8. Test insulation, capacity, protection and temperature.

9. Record the serial number and test results.

Building a pack for your needs

Cimahi Battery Industry manufactures prismatic cells and builds custom battery packs in Cimahi, following the steps above.

To discuss your requirements, prepare the target voltage and capacity, the available space and the devices to be connected. Contact our team via WhatsApp +62 822 6090 4770 or email cimahibattery@gmail.com.

Our full profile is on the lithium battery manufacturer in Indonesia page. Components we use, such as the JBD LiFePO4 BMS, are also sold separately.

Battery Consultation & Engineering

Need Battery Pack Engineering or Material Testing?

Discuss industrial-grade custom lithium battery assembly or laboratory material testing directly with CBI engineers.

← Back to All ArticlesPT Cimahi Baterai Indonesia